Parking bays outside The University of Manchester’s £60m Graphene Engineering Innovation Centre (GEIC) were chosen as a first demonstrator for outdoor performance of Concretene. The trial was funded and contracted by Nationwide Engineering.
This trial involved thinning of the slab, removal of anti-crack mesh and no expansion joints.
The slab has performed well after three years of weather-exposure and highway loading with no visible signs of wear.